Which step in concrete work commonly requires the use of a bull float?

30%
Which step in concrete work commonly requires the use of a bull float?
Correct!
Incorrect!

The bull float is used right after screeding to level and smooth large areas of freshly poured concrete.

Which step in concrete work commonly requires the use of a bull float?

Transporting wet concrete to the pour site
Breaking up old concrete slabs
Cutting expansion joints
Smoothing large surface areas immediately after screeding